Pipeline life extension and integrity management based on optimized use of above ground survey data and inline inspection results

We present a detailed description of probabilistic methodologies based on Bayesian updating and structural reliability analysis for optimizing sur­vey and/or inspection frequencies in a way that provides cost-effective solutions for ongoing integrity management or indeed for life extension or pressu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2009
Hauptverfasser: Francis, A., McCallum, M., Jandu, C.
Format: Artikel
Sprache:English
Veröffentlicht: Інститут проблем міцності ім. Г.С. Писаренко НАН України 2009
Schriftenreihe:Проблемы прочности
Schlagworte:
Online Zugang:http://dspace.nbuv.gov.ua/handle/123456789/48440
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:Digital Library of Periodicals of National Academy of Sciences of Ukraine
Zitieren:Pipeline life extension and integrity management based on optimized use of above ground survey data and inline inspection results / A. Francis, M. McCallum, C. Jandu // Проблемы прочности. — 2009. — № 5. — С. 36-54. — Бібліогр.: 4 назв. — англ.

Institution

Digital Library of Periodicals of National Academy of Sciences of Ukraine

Ähnliche Einträge