APA-Zitierstil (7. Ausg.)

Stefanyshyn, D. V. (2015). The rationale for cost-optimal values of the design water flow rate low probability of exceedance for culvert structures risk-based.

Chicago-Zitierstil (17. Ausg.)

Stefanyshyn, D. V. The Rationale for Cost-optimal Values of the Design Water Flow Rate Low Probability of Exceedance for Culvert Structures Risk-based. 2015.

MLA-Zitierstil (8. Ausg.)

Stefanyshyn, D. V. The Rationale for Cost-optimal Values of the Design Water Flow Rate Low Probability of Exceedance for Culvert Structures Risk-based. 2015.

Achtung: Diese Zitate sind unter Umständen nicht zu 100% korrekt.