Strategy of NPP I&C Systems’ Modernization in Ukraine

The stages of modernization of Ukrainian NPP I&C systems are described in the paper. The first stage (1993—2000) was characterized by use of systems designed by foreign (including USA) companies. The second stage (2001—2011) was characterized by use of systems designed by Ukrainian companies...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Datum:2012
Hauptverfasser: Yastrebenetsky, M., Rozen, Yu., Klevtsov, A., Gashev, M.
Format: Artikel
Sprache:English
Veröffentlicht: Державне підприємство "Державний науково-технічний центр з ядерної та радіаційної безпеки" Держатомрегулювання України та НАН України 2012
Schriftenreihe:Ядерна та радіаційна безпека
Online Zugang:http://dspace.nbuv.gov.ua/handle/123456789/97250
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Назва журналу:Digital Library of Periodicals of National Academy of Sciences of Ukraine
Zitieren:Strategy of NPP I&C Systems’ Modernization in Ukraine / M. Yastrebenetsky, Yu. Rozen, A. Klevtsov, M. Gashev // Ядерна та радіаційна безпека. — 2012. — № 4. — С. 59-62. — Бібліогр.: 4 назв. — англ.

Institution

Digital Library of Periodicals of National Academy of Sciences of Ukraine
Beschreibung
Zusammenfassung:The stages of modernization of Ukrainian NPP I&C systems are described in the paper. The first stage (1993—2000) was characterized by use of systems designed by foreign (including USA) companies. The second stage (2001—2011) was characterized by use of systems designed by Ukrainian companies. The modernization strategy is analyzed in two aspects: the strategy of operators and the strategy of I&C systems’ designers. Some features peculiar to the strategy of designers are: an aggregate of hardware, software and service apparatus called “hardware-software complex” (HSC) as central part of systems, which are delivered to NPPs in full assembly and are connected to peripheral equipment at NPP; use of FPGA for performance of safety functions; elaboration of new equipment families. The third stage starts in 2012 and is related to construction of two new units (Khmelnitsky-3 and 4). A new regulatory framework, including regulatory requirements, will be elaborated for I&C systems of these units.