Аналіз фактичних витрат Чорнобильської АЕС за допомогою міжнародної структури витрат на зняття з експлуатації
The paper presents the analysis of actual costs for the decommissioning of Chornobyl NPP units 1, 2 and 3 in compliance with the International Structure for Decommissioning Costing ISDC (according to IAEA recommendations) in 2002–2015. The results obtained demonstrate the importance of the soonest p...
Gespeichert in:
Datum: | 2018 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | English |
Veröffentlicht: |
State Scientific and Technical Center for Nuclear and Radiation Safety
2018
|
Online Zugang: | https://nuclear-journal.com/index.php/journal/article/view/92 |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Назва журналу: | Nuclear and Radiation Safety |
Institution
Nuclear and Radiation SafetyZusammenfassung: | The paper presents the analysis of actual costs for the decommissioning of Chornobyl NPP units 1, 2 and 3 in compliance with the International Structure for Decommissioning Costing ISDC (according to IAEA recommendations) in 2002–2015. The results obtained demonstrate the importance of the soonest possible reconstruction of the infrastructure of ensuring site life sustaining activities immediately after the final shutdown of power units to save resources. It is also a good illustration of the need to accumulate significant costs in NPP operation to create decommissioning infrastructure. |
---|